Email Print

PowerCLEAN Wellbore Fill Removal

Overview Library

Integrated Wellbore Fill Removal System for Coiled Tubing

PowerCLEAN engineered fill removal service cleans previously uncleanable tools at up to 325 degF. The service integrates an optimized jetting nozzle and cleanout fluids with job-planning software and real-time monitoring.

This coiled tubing service can remove produced sand and fines, proppant left behind after fracturing, or excess gravel from gravel-packing operations efficiently and completely. Our service leaves the tools fully open for maximum hydrocarbon production and problem-free tool runs.

Clean deviated and horizontal sections

Significant amounts of fill are often left in highly deviated or horizontal tools sections when you use conventional cleanout nozzles. PowerCLEAN nozzle technology agitates the solids, entrains them in the cleanout fluid, and prevents particles from falling back past the nozzle.

The result is quick and complete solids removal at lower flow rates than conventional nozzles allow. With the PowerCLEAN service, effective cleaning is possible at flow rates as low as 1 bbl/min for 7-in casing and 2 bbl/min for 9 5/8-in casing at any deviation angle.

Increase simulation accuracy

User-friendly PowerCLEAN software lets you optimize equipment, fluids, and job procedures. The optimized job design cuts costs by shortening cleanout time and reducing the fluid volume to be pumped.

Related services and products

 
Request More Information

Case Study

Improve Production Rate
Successful wellbore fill removal increased gas production 5-fold in highly deviated wells, Gulf of Mexico.
Read case study