Email Print

CT TComp Coiled Tubing Compensation Package for Offshore

Safer, More Efficient Heave Compensation and Wellhead Stress Management

CT TComp coiled tubing (CT) total compensation system for offshore protects wellhead integrity during CT operations by limiting wellhead stresses. The system compensates for vertical and horizontal wellhead motion inside or outside the derrick. Rig up is faster and requires less personnel than with conventional systems.

The system is preassembled in three skids, one each for the hydraulic power unit, BOP, and injector. Fewer than half the minimum number of lifts are required to load conventional equipment onto the platform. All components are delivered, installed, and tested within their frames without requiring unpacking or assembly. Virtually every feature is designed to save time and reduce costs.

The system can be used as

  • a motion-compensated jacking frame
  • a 350-ton tension-lift frame
  • an internally compensated tension.

Related resources

 
Request More Information