Coiled Tubing Equipment
Advanced CT Equipment Reduces Rig Time
Our new-generation coiled tubing (CT) equipment further increases the efficiency of these services. CT EXPRESS rapid-deployment unit has reduced rig uptime from 3 hours to less than 30 minutes. CT SEAS safer, efficient, automated solution has reduced operations from 3.5 days to 2.
The capabilities of four trucks into two tractor trailer units.
The economic answer for offshore CT operations.
Fit-for-purpose engineering solution for deepwater operations.
Flexible, fit-for-purpose design