Email Print

Petrel Drilling

Overview Library

Well path design, drilling visualization, & real-time model updates

Petrel workflows improve operational efficiency by setting an environment to visualize and understand relationships between the drilling processes in the earth context.

Benefits

  • Maximize reservoir exposure by designing a well trajectory, understanding at initial stages the potential risks the well might be exposed to
  • Understand the relationship between actual undesired drilling events (well control, mud losses, wellbore stability, stuck pipe, etc.) in geological context
  • Monitor execution in a proactive manner in real time to ensure optimum well position and foresee potential risks when the actual well path trajectory is approaching a risk zone, deviations from planned well trajectory, and variations in the prognosis.

Drilling Visualization for Petrel

Real-Time Data Link

Petrel Well Path Design

Request More Information

Case Study

Petrel drilling visualization plug-in unlocks integration, detail, and speed. Read Case Study

Learn More

Petrel 2011 display of drilling eventsPetrel 2011 enables the creation of geological targetsPetrel 2011 drilling engineer capabilities
PrevNextZoom1 of 3