Coiled Tubing-Deployed ESP System
Coiled tubing-deployed ESP systems or cable-deployed ESP systems improve productivity while lowering life cycle costs. ESP systems help achieve high rates in problem wells, wells unsuitable for gas lift (such as subsea step-outs), or where there is insufficient gas available to sustain gas lift.
Reduced workover costs
Worldwide projects using RedaCoil coiled tubing-deployed ESP systems or cable-deployed ESP systems showed a 50% to 60% reduction in workover cost compared with jointed, tubing-deployed systems.
An important innovation is installing the power cable securely within the coiled tubing. Besides faster installation and retrieval, this field-proven method provides cable protection and the ability to strip in and out of a live well.
Fast, low-cost deployment and retrieval of pumping system