Project evaluation requires detailed engineering analysis to guarantee technical capability, and continued economic scrutiny to ensure ongoing success.
A pilot project is used to analyze long-term investment return together with production changes.
Simulators are used to model multiphase flow from the reservoir to the wellhead.
This powerful analytical tool assesses heavy oil investment performance against key corporate economic and financial metrics and enables multiple what-if scenarios to be analyzed.
Request More Information
|