High-Permeability Stimulation
Stimulation Treatments for High-Permeability Formations
As formation permeability increases, creating and propagating fractures become more difficult and less essential to improving well economics. In high-permeability reservoirs, the major restraint on productivity is usually formation damage. Matrix acidization treatments or a hydraulic fracturing stimulation strategy that creates short and wide fractures are used to mitigate the effects of formation damage.
Maximize fracture conductivity with polymer- and solids-free fluids.
Optimize the removal of RDF deposits.
Improve productivity with better stimulation technology.
ClearFRAC polymer-free fracturing fluids enable a larger effective fracture half-length.
Remove and prevent scale within wellbores and the reservoir.
Request More Information