SenTREE 3 well testing operations
The deep water control system (DWCS) provides fast-acting control of the SenTREE 3 subsea test tree for well testing operations performed from floating vessels.
Sequenced shut-ins
This combination of technologies performs a sequenced shut-in and unlatches from the landing string in as little as 15 seconds in water depths to 15,000 ft.
Applications
- Well tests
- Well cleanup operations
Benefits
- Configuration flexibility to meet specific requirements without custom systems for each operation
- Integration with any subsea system and BOP stack
- Safety and reliability improvements through standardization of modular components
- Reliable performance from proven technology, extensive testing, and 30-plus years of subsea experience
- Support by Schlumberger personnel from program design to project completion
Request More Information
|